Kitchen renovations in London, Ontario
From a full gut to a smarter layout: your kitchen planned around how you cook and what the City requires, then built and managed by one team.
We usually call back within 24 hours.


A kitchen built around how you cook
Your kitchen is the room that works hardest. The renovation decides where the sink, the stove and the fridge sit, how much room you have between them, and whether the cabinets fit the appliances you actually bought. Get those right and the finishes are the easy part.
We take on a kitchen on its own or together with the rest of the house. Renovating more than the kitchen? See home renovations.
- Full kitchen renovations, down to the studs
- New layouts: an island, an opened-up wall, a sink in a better spot
- Cabinets, counters, backsplash and lighting
- Smaller kitchens and kitchenettes
What homeowners say
A-04.1We hired Pro Home Contracting for a complete kitchen renovation, and I couldn't be more impressed. From the initial consultation to the final touches, Bryan demonstrated a high level of professionalism and attention to detail. They worked with us to design the kitchen of our dreams, keeping our needs and budget in mind. The project was completed on time, and we were kept informed throughout the process. The craftsmanship is exceptional, and we absolutely love our new kitchen. I would recommend Pro Home Contracting to anyone looking for quality renovation work.
Popitha Selvanayagam / Google review
Can't recommend Pro Home Contracting enough! Bryan is extremely professional and very knowledgeable in every aspect of what he does. You can tell he takes pride in everything he puts his hands on. Thanks again for the great experience and service.
Justin H / Google review
Bryan and his team have done a great job with the many projects/renovations we've done to our house and property over the past 8 years. A pleasure to deal with and always happy to take on and complete any curveballs we throw in at the last minute!
Kerri Snell / Google review
What needs a permit for a kitchen in London
A-04.2Moving things usually needs a permit. New cabinets and cupboards, painting, and a sink, window or door replaced in the same spot at the same size don't. These are the four to check first.
- 01
Walls
Moving or taking out a wall is an interior alteration, and interior alterations need a permit. A wall that carries load also needs a beam designed to replace it.
- 02
The sink and the drains
Adding, removing or moving a sink needs a permit, and so does installing or replacing drain lines. Replacing a sink in the same spot doesn't.
- 03
Windows and doors
A new window or door, or a bigger one, needs a permit. Replacing one with the same size doesn't.
- 04
Ducts and wiring
Changing your heating ducts needs a City permit. Electrical work goes through Ontario's Electrical Safety Authority (ESA) instead: a Licensed Electrical Contractor files a notification of the work with the ESA, which is the permit for it.

Plan it in this order
Bryan's planning advice. The kitchen pictured is his own.
- Decide what moves. The sink, the stove and the walls set the size of the job. Keep them where they are and it stays simpler. Move them and you add plumbing, wiring and often a permit.
- Appliances before cabinets. Cabinets are built around the openings, so you need the exact size of everything first. Order the appliances in advance, and the cabinets are designed to fit them.
- Leave room to work. Give yourself space in front of the fridge and the cooktop. If the room has the space, use it, especially around an island where everybody gathers.
- Plan the light with the cabinets. Lights in glass-front uppers, under the cabinets or over the island are wired before the walls close, so decide them with the layout, not after.
How your kitchen renovation runs
A-04.3Three steps, each with a clear scope, so you know what you're getting before you commit.
- 01
Discovery session
We walk the room, measure it and mark the load-bearing walls and the paths of the plumbing, ducts and wiring, so you know what can move before anything is drawn.
- 02
Design + permit
The layout and the cabinet plan, built around your appliances. Drawings from our licensed partners where the work needs them, and the permit when your plan needs one.
- 03
Project management
We source and manage the trades, check the work on site and attend the City's inspections, with weekly progress updates. All our work carries a minimum one-year warranty.
Kitchen renovations: permits, cost and timing
A-04.4-
Not for new cabinets and cupboards, painting, or a sink replaced in the same spot. You do need one if you move or take out a wall, add or move the sink, add or enlarge a window or door, or change your heating ducts. That's the City of London's list. Electrical work is permitted separately, through the ESA.
-
Let's give it to you straight: it depends on what moves. New cabinets and counters in the same layout are one job. Moving the sink, opening a wall and rewiring for new appliances is a bigger one. Start from the list of what you want to change and price that. Then add a contingency of 10 to 20% for what you find behind the old cabinets, plus the City's permit fee if you need one (the minimum is $260.37).
-
It depends on the scope, and on the cabinets, which are built to fit your appliances, so the appliances get picked first. If your plan needs a permit, London reviews a complete application for a house renovation within 10 business days. Once work starts, you get a progress update every week.
-
Often, yes, but find out first whether it carries load. A load-bearing wall needs a beam sized for what it held, and that means a design and a permit. The drawings come from our licensed partners, and you'll know which walls carry load after the discovery session, before anything is drawn.
-
Yes. A kitchen on its own is a job we take on. If it's one part of a bigger plan, like new layouts across the main floor, our home renovations page covers how we run that as one project.
-
A second kitchen with its own washroom and a separate entrance makes a self-contained unit, which London treats as an additional residential unit (ARU). It needs a building permit and a rental licence from the City. Our ARU guide covers the rules.
Related services
A-04.5Planning a kitchen renovation?
Book a free consultation. We'll talk through what you want to change, what has to move and what the City requires. We carry comprehensive insurance and give a minimum one-year warranty on all our work.
Book a free consultationWe usually call back within 24 hours.
Talk to Bryan
Bryan Serrador has over 20 years of experience in the London, Ontario market. We work in London and about 30 minutes around it, plus the Dorchester area.
Call (519) 520-9968
