Bathroom renovations in London, Ontario
From a full remodel to a spa-inspired ensuite: your bathroom planned around the plumbing and the City's rules, then built and managed by one team.
We usually call back within 24 hours.


Spa-inspired bathrooms, built right
A bathroom packs a lot into a small room: water, drains, power, ventilation and tile that has to last. The layout decides most of it, because moving a toilet or a shower means moving the drain under it. Plan that first, and the finishes have room to shine.
We take on bathroom remodels on their own, from a powder room to both main bathrooms at once. Renovating more of the house? See home renovations.
- Full bathroom remodels, down to the studs
- Main bathrooms and master ensuites
- Powder rooms
- A new bathroom in the basement
What homeowners say
A-05.1We can't say enough good things about Pro Home Contracting and their team. Our first project with them was an outdoor kitchen, deck, and gazebo. We were extremely impressed with their professionalism and attention to detail. They just finished our second project - complete remodels of both of our main bathrooms - and we're thrilled. Bryan was always available for questions, and his team listen, provide honest recommendations, and go above and beyond. They guided us well in making the right choices, had a good network of businesses to help us source items, and there weren't any hidden costs. We highly recommend Pro Home and look forward to working with them on our next project.
Cher C / Google review
Dealing with Bryan and his team was seamless and their craftsmanship was very meticulous and beautiful. Thank you so much!
Angela Chioros / Google review
What needs a permit for a bathroom in London
A-05.2Moving a fixture needs a permit. A toilet, tub, shower or sink replaced in the same spot, new cabinets and painting don't. These are the four to check first.
- 01
Moving fixtures
Adding, removing or moving a toilet, tub, shower or sink needs a permit. Replacing one in the same spot doesn't.
- 02
Drains
Installing, replacing or repairing drain lines needs a permit, so a new shower drain is permit work.
- 03
Walls
Moving a wall to make the room bigger is an interior alteration, and interior alterations need a permit.
- 04
Ducts and wiring
Changing your heating ducts needs a City permit. Electrical work, like a heated floor, goes through Ontario's Electrical Safety Authority (ESA): a Licensed Electrical Contractor files a notification of the work, which is the permit for it.

Decide these before the walls close
Bryan's own master bathroom has heated floors, a heated towel rack and a steam shower. These are the decisions to make before the walls close.
- Where everything goes. The toilet, the shower and the sink set the drain layout. Keep them in place and the plumbing stays simple. Move them and you're into new drains and a permit.
- What needs power. A heated floor, a heated towel rack, the lights at the mirror: each one needs wiring in place before the tile goes down.
- The shower. Size, glass and controls, and for a steam shower, its own steam unit.
- Tile and finishes. Big-format tile and one metal finish across the faucets, like all brass, give a bathroom a high-end look.
How your bathroom renovation runs
A-05.3Three steps, each with a clear scope, so you know what you're getting before you commit.
- 01
Discovery session
We walk the room, measure it and trace the drains, supply lines and wiring, so you know what can move before anything is drawn.
- 02
Design + permit
The layout, the fixtures and the tile plan. Drawings from our licensed partners where the work needs them, and the permit when your plan needs one.
- 03
Project management
We source and manage the trades, check the work on site and attend the City's inspections, with weekly progress updates. All our work carries a minimum one-year warranty.
Bathroom renovations: permits, cost and timing
A-05.4-
Not if the toilet, tub, shower and sink stay where they are. Adding, removing or moving any of them needs a permit in London, and so does installing or replacing drain lines or moving a wall. Electrical work is permitted separately, through the ESA.
-
It depends on what moves and what you put in. The same layout with new finishes is one budget. New drains, a bigger shower and new wiring is another. Start from the list of what you want to change and price that. Then add a contingency of 10 to 20% for what you find behind the old tile, plus the City's permit fee if you need one (the minimum is $260.37).
-
It depends on the scope and on the lead time for the fixtures you pick. If your plan needs a permit, London reviews a complete application for a house renovation within 10 business days. Once work starts, you get a progress update every week.
-
Both are planned before the walls close. A heated floor needs its wiring in place before the tile goes down, and electrical work goes through the ESA. A steam shower needs its own steam unit, and one digital valve can run the shower heads and the steam from a single control.
-
Usually, yes. A new bathroom means new fixtures and new drain lines, so it needs a permit. In a basement the drains run under the floor, so we look at where yours run before we plan the layout. Finishing the rest of the basement too? Our home renovations page covers it.
-
Yes. One bathroom, a powder room, or both main bathrooms at once. If the bathroom is one part of a bigger renovation, our home renovations page covers how we run that as one project.
Related services
A-05.5Planning a bathroom renovation?
Book a free consultation. We'll talk through what you want, what has to move and what the City requires. We carry comprehensive insurance and give a minimum one-year warranty on all our work.
Book a free consultationWe usually call back within 24 hours.
Talk to Bryan
Bryan Serrador has over 20 years of experience in the London, Ontario market. We work in London and about 30 minutes around it, plus the Dorchester area.
Call (519) 520-9968
